Bryan Faces More Road Closures

By: KBTX Staff Email
By: KBTX Staff Email

Martin Luther King Jr. Blvd between Harlem Lane and Bowery Street will be closed starting Monday Nov. 26 in Bryan.

The closure is required in order to replace the drainage culverts at this location with a substantially larger structure to provide needed flood protection in this area. The repairs will also provide a safe and secure traffic route during severe rainfall.

The closure should last 4 to 6 weeks depending on weather.
There will be a 2-way traffic detour using Columbus Avenue, West 17th Street, and Harlem lane.

This work is part of a nearly $352,000 project identified by the Bryan Storm Water Master Plan to increase flood protection and safety. It's funded by the City's Drainage Utility Fee and Transportation Fee.


Join the Conversation!

To comment, the following rules must be followed:

  • No Obscenity, Profanity, Vulgarity, Racism or Violent Descriptions
  • No Negative Community Comparisons
  • No Fighting, Name-calling, Trolling or Personal Attacks
  • Multiple Accounts are Not Allowed
  • Stay on Story Topic

Comments may be monitored for inappropriate content, but the station is under no legal obligation to do so.
If you believe a comment violates the above rules, please use the Flagging Tool to alert a Moderator.
Flagging does not guarantee removal.

Multiple violations may result in account suspension.
Decisions to suspend or unsuspend accounts are made by Station Moderators.
Questions may be sent to comments@kbtx.com. Please provide detailed information.

powered by Disqus
KBTX-TV Channel 3 4141 E. 29th Street Bryan, TX 77802 Phone: (979) 846-7777 Fax: (979) 846-1490 News Fax: (979) 846-1888
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 180787311 - kbtx.com/a?a=180787311