TRAFFIC ALERT: Part of Memorial Drive Closed Tuesday

By: KBTX Staff Email
By: KBTX Staff Email

BRYAN Drivers should plan for delays on part of Memorial Drive, in Bryan, Tuesday. Road crews are finishing up road work.

On Tuesday, March 25, 2014, Vaughn Construction, contractor working for St. Joseph Hospital, will have the southbound lane of Memorial Drive closed from E. 29th to the hospital entrance driveway.

The closure could last most of the day but will be removed as soon as the contractors finish their work. Southbound through movements on Memorial and left and right turns onto Memorial from E. 29th will not be allowed during this road closure. Northbound through traffic on Memorial and right turns from Memorial onto E.29th will still be allowed during this lane closure.

Motorists should plan ahead and take alternate routes, such as Kent Street, to reach that section of Memorial. Motorists are also urged to use caution in the area, slow down, obey all traffic signage and watch for workers.


KBTX-TV Channel 3 4141 E. 29th Street Bryan, TX 77802 Phone: (979) 846-7777 Fax: (979) 846-1490 News Fax: (979) 846-1888
Copyright © 2002-2015 - Designed by Gray Digital Media - Powered by Clickability 252206431 - kbtx.com/a?a=252206431
Gray Television, Inc.