Road Work to Shut Down Bryan Intersection

One well-travelled Bryan street will temporarily be closed for some needed road work.

The Broadmoor-Briar Creek intersection will be shut down starting Thursday at 8 a.m. through the early evening hours Friday.

New manholes will be installed in the area, along with a new section of sewer line. Heavy equipment will be moving along the roads during that time.

Trophy Drive, Red River Drive, West Briargate are options to the north. To the south, you can take Rustling Oaks or Broadmoor off of 29th Street.


KBTX-TV Channel 3 4141 E. 29th Street Bryan, TX 77802 Phone: (979) 846-7777 Fax: (979) 846-1490 News Fax: (979) 846-1888
Copyright © 2002-2015 - Designed by Gray Digital Media - Powered by Clickability 26104564 - kbtx.com/a?a=26104564
Gray Television, Inc.